VREG Beleidsplatform This document is intended for introductory discussion. Any use of the information contained herein for purposes other than those mentioned,

Slides:



Advertisements
Verwante presentaties
Febeliec represents the industrial consumers of electricity and natural gas in Belgium Technisch reglement distributie (E+G) Opmerkingen Febeliec 11/4/2012.
Advertisements

Stroomloos: niet onmogelijk Komen black-out’s voor ?
Atos, Atos and fish symbol, Atos Origin and fish symbol, Atos Consulting, and the fish itself are registered trademarks of Atos Origin SA. August 2006.
Kouwe Hoek PX Waddinxveen Rooftop EnergyRooftop Energy.
AberdeenGroup surveyed 125 companies to understand their product innovation goals. Top challenges reported by these companies were: Cost pressure from.
De digitale coach Het verbeteren van een plan van aanpak Steven Nijhuis, coördinator projecten FNT Deze presentatie staat op:
Mobiliteit bij lokale overheden. Ferranti Koen VerbeeckRaf De BackerEnterprise Architect 03/ /
Een dak vol zonnepanelen Betrek de hele community bij Duurzame energie op school Doe mee met Solar Schools Nederland.
EUROPEES PROJECT ASINP With the financial support from the Prevention of and Fight against Crime Programme of the European Union European Commission –
anti-vortex Windmetingen Gustiness & vortex compensation.
Validatie en kwalificatie van een temperatuur gecontroleerde Supply Chain Gert-Jan van Diest IGZ Congres - De Nieuwe GDP Guideline Nieuwegein, 2 september.
Logistics: a driver for innovation Low costs High value Flexibility now and later Superior technology Timwood - T > No transport - I > No Inventory - M.
Inspectie beleid GDP Guideline
This document is strictly confidential and must not be given to any third party, or be reprinted or copied in whole or in part without the prior consent.
Delivering Value for Less A cceleration C enter for E ngagements Templates Oubollig of Agile Maurice Siteur ACE Service Manager Testing.
CEN/TC 433 Entertainment Technology
Hoe kijkt een ondernemer naar de overheid
EUROCITIES-NLAO is supported under the European Community Programme for Employment and Social Solidarity (PROGRESS ). The information contained.
IR pictures Hoe goed is jouw woning?. How to assess the energetic quality of a dwelling? To know = to measure But: “De spreiding in het gasverbruik van.
Deltion College Engels A2 Lezen [Edu/001] thema: What about smoking in this B&B? can-do : kan specifieke informatie vinden en begrijpen in eenvoudig, alledaags.
Kyoto in het Pajottenland. Educatief centrum de Paddenbroek vzw Opbouwwerk Pajottenland vzw Pro Natura Sociale Werkplaats vzw Innovatiesteunpunt voor.
Deltion College Engels C1 Spreken [Edu/002] thema: A book that deserves to be read can-do : kan duidelijke, gedetailleerde samenvatting geven van een gelezen.
London Online Information 4 december Webanalytics Communities Collaboration Web 2.0 Social Web Multichannel Traffic Conversie Accountability.
Wat staat er achter de blokjes? Vlgnd. dia Instructie: 1.De maker plaatst foto’s achter de blokken van elke dia. Om te spelen: 1.Bedenk (eenvoudige)
Weesziekten en weesgeneesmiddelen
Deltion College Engels B2 Lezen [Edu/003] thema: Topical News Lessons: The Onestop Magazine can-do: kan artikelen en rapporten begrijpen die gaan over.
Beleidsplatform Slimme netten 24 juni Agenda Inleiding: Lopende initiatieven en plan van aanpak (VREG) Flexibiliteit voor behoud van.
Deltion College Engels B2 Spreken [Edu/001] thema: What’s in the news? can-do : kan verslag doen van een gebeurtenis en daarbij meningen met argumenten.
Deltion College Engels B1 Spreken [Edu/001] thema: song texts can-do : kan een onderwerp dat mij interesseert op een redelijk vlotte manier beschrijven.
Deltion College Engels B2 Gesprekken voeren [Edu/007] thema: ‘With this mobile you can…’ can-do : kan op betrouwbare wijze gedetailleerde informatie doorgeven.
Spelen Instructions: 1) Verdeel klas in teams. 2) Stel een vraag aan een team. 3) Bij een goed antwoord mag er aan het rad gedraaid worden. 4) Typ het.
PASSIE VOOR GEZONDHEID
Minor Project- en Programmamanagement
GegevensAnalyse Les 2: Bouwstenen en bouwen. CUSTOMER: The Entity Class and Two Entity Instances.
2 december 2015, Privacy en de Digital Enterprise Vertrouwen in data.
Referentievlakken in de Noordzee zowel een nationaal als internationaal verhaal.
Hoe lang nog fossiele brandstoffen? Henk Grootveld, Hoofd Trends Investing & fondsbeheerder Rolinco Amsterdam, maart
Titeldia ENTRADA: The Impact of a TTL Change at the TLD Level Maarten Wullink| DNS-OARC Spring 2016 workshop March 31 st 2016.
Guides for gutter Text colours R 27 G 66 B 152 R 0 G 0 B 0 R 127 G 127 B 127 Background.
The Research Process: the first steps to start your reseach project. Graduation Preparation
De Betekeniseconomie.
Key Process Indicator Sonja de Bruin
Standaarden en spelregels voor de Slimme Stad
Giving hands and feet to the digital substation
= Data management Voor uitvoering en communicatie Informatie tijdens het ontwerp- en het bouwproces Werken met het InfraModel Het begin van de verandering!
Innovatie met IBM Cloud Orchestrator.
Microsoft SharePoint Server 2013
Inhoudsopgave Fasering Product Clearing & Settlement
Regels voor vastleggen van ELVs
Sector, Firm Size and ICT investments
E22 Eastern Entrance to Riga
Werkwijze Hoe zullen we als groep docenten te werk gaan?
De taaltaak
#5. MULTI-ACTOR SAMENWERKING | CITY-OF-THINGS
Welkom bij Workspace 365, kunnen wij ergens bij helpen
Sessie: Structurele evaluatie voor adaptief beleid
VOS-identificatie en kwantitatieve bepaling d.m.v. gaschromatografie
Sneller een beter personeelsrooster voor de gynaecologieafdeling van het JBZ Maartje van de Vrugt PhD.
Introduction of second Rijkswaterstaat Pilot Asses further improvements of the HIJ barrier in relation to system of HIJ Welcome, my name is Pim Neefjes.
What is ProRail’s Life Cycle (cost) Management?
NL: We zitten in een Verandering van Tijdperken in plaats van een Tijdperk van Verandering.
Kees Jan Groenewoud Raad voor plantenrassen
ACTmodel van psychopathologie
R&D Satellite Accounts in the Netherlands OECD-NAWP 3-5 October 2007
DE ADVIEZEN VAN BEURSMAKELAAR BERNARD BUSSCHAERT
Dynamic Architecture What about you?
Towards and Africa Europe Partnership
Matthew 16 “But who do you say that I am?”  Simon Peter replied, “You are the Christ, the Son of the living God.”  And Jesus answered him, “Blessed are.
DE NAYER INSTITUUT Hogeschool voor Wetenschap & Kunst
VOS-identificatie en kwantitatieve bepaling d.m.v. gaschromatografie
Transcript van de presentatie:

VREG Beleidsplatform This document is intended for introductory discussion. Any use of the information contained herein for purposes other than those mentioned, is prohibited. Unauthorized distribution is prohibited. REstore 1, Glass Wharf Bristol BS2 0ZX United Kingdom REstore Flexpond UK Ltd. Arthur Matthyslaan Antwerp Belgium REstore NV/SA

2 Agenda 1Wat is “demand response” 2Wie is “REstore” 3Tertiaire reserve 2013 REstore - ELIA 4Voorwaarden tot succes

3 Bij vraagsturing (Demand Response / Effacement) wordt vermogenvraag in real-time gereduceerd, voor ‘balancing’ of ‘reserve’ doeleinden Strictly confidential Response time: 100% delivered in 2min20sec Curtailable reserve (R ref ): 4,64 MW curtailable power demand. “Hard commitment”

4 Marktstructuur Fully automated REstore managed from start to finish No human intervention required 10x MW demand response

5 Vraagsturing / demand response biedt belangrijke voordelen voor de maatschappij: lagere kost en minder CO2 GascentraleVraagsturing EUR/ MW/jaar Vraagsturing/aggregatie heeft significant lagere kosten Vraagsturing/aggregatie bespaart CO2 emissies > 100,000 < 35,000 GascentraleVraagsturing > à 300 grCO2/ KWH

6 Agenda 1Wat is “demand response” 2Wie is “REstore” 3Tertiaire reserve 2013 REstore - ELIA 4Voorwaarden tot succes

7 REstore is een Demand Response aggregator WIEWAT  Nieuwe dienstverlener op de Europese energiemarkt (aggregator)  Opgericht in 2010 door Jan-Willem Rombouts en Pieter-Jan Mermans  Twee succesvolle kapitaalrondes; >4 M€ aan venture capital (om. LRM, AXE Investments / AckermansVanHaaren)  “Senior” Raad van Bestuur (R. Thomaes, P. Carpentier, W. Heyselberghs, S. Bijnens)  Actief in Benelux & UK  Verzamelt ongebruikte en afschakelbare elektrische capaciteit bij industriële en professionele klanten  Stelt deze gegroepeerde capaciteit voor aan energie marktspelers (Elia, EDF- Luminus, National Grid,...)  Beschikt over haar eigen technologie platform Flexpond TM

8 Agenda 1Wat is “demand response” 2Wie is “REstore” 3Tertiaire reserve 2013 REstore - ELIA 4Voorwaarden tot succes

9 Pilot project scope: 10 MW of interruptible load from industrial power consumers DR directionDemand curtailment. Term1/1/2013 – 31/12/2013 LoadsAll are DGO-connected # of sites aggregated15 Response time< 3 min Number of utilizations /year25 Max. utilisation time / activation120 min Cease time< 30 min Recovery period12 hrs # of ARPs involved4 # of DSOs involved3

10 Two deviations from ELIA-ARP contract, validated by all involved ARPs, due to DSO-connected load Settlement: how to meter demand from DGO- connected loads No “Nomination” available => no compensation of ARP perimeter REstore provides real-time metering signals at the level of the Aggregated Site to ELIA. One signal per 30 seconds shall be provided. Meters comply with the technical and accuracy specifications of DGO-approved AMR meters. Meters measure demand at the level of the EAN, or exceptionally in context of this pilot project, may be measuring the demand of the equipment which is contracted for demand curtailment. REstore provides to ARP in quasi real-time all relevant metering values whenever load from ARP perimeter is curtailed. No compensation of the ARP perimeter to correct for the interruption instruction, as no nomination data per EAN is available to ELIA for DSO connected loads. As a result, ARP will have an imbalance which is by default opposite to the overall system imbalance, hence will always receive the imbalance tariff as generation > demand. Validation for scope of pilot project with all involved ARPs

11 Two types of demand curtailment: “fixed Rref” - model (~ R3 production) versus the “ICH / SL” – model “Fixed R ref ”-model: R ref always 100% delivered “ICH / Shedding Limit” - model Fixed R ref Shedding Limit R ref not delivered. Variable “energy” delivery over the year. R ref 100% delivered & guaranteed - always Comparable to turbine – classic “R3 production” MW EU benchmark: 50Hertz, Tennet, National Grid,... !

12 Agenda 1Wat is “demand response” 2Wie is “REstore” 3Tertiaire reserve 2013 REstore - ELIA 4Voorwaarden tot succes

13 Demand Response: pathway to success Algemeen: Gelijkwaardige behandeling van demand response en centrales in de reserves; Bv. geen volumebeperkingen voor demand response Overleg & transparantie: Bv. Atrias kick-off Eenvoudige markttoegang (geen onnodige drempels): Bv. notificatie van, geen toelating door, BRPs Duidelijke en stabiele technische parameters (reactietijd, afschakeltijd, # afschakelingen per jaar, etc); Adequate financiële vergoeding teneinde deelname van aggregatoren en verbruikers te stimuleren; Specifiek ikv. R3 Dynamic Profile: Convergentie contract BSP-DSOs enkel mogelijk dmv. bilateraal overleg tussen Balancing Service Providers en DSOs Transparant & efficiënt pre-qualificatie proces noodzakelijk Investeringsonzekerheid wegnemen door disqualificatierecht af te bakenen

14 REstore NV/SA Arthur Matthyslaan 61 B-2140 Antwerp, Belgium Tel.: +32/3/ Cell.: +32/