Selection and decision-making criteria for a Distributed Control Systems in the process industry Willem D. Hazenberg Senior Process Control Consultant.

Slides:



Advertisements
Verwante presentaties
Update on EduStandard: public-private platform in Dutch education Henk Nijstad, Kennisnet / november 2013.
Advertisements

Kwalificaties op EQF niveau 5
The stock market will go up De beurswaarden zullen stijgen YESNO JA NEEN Is Jefken a good person ? Is Jefken een goed mens ? YES NO JA NEEN Is Lonny a.
Simuleren van DOT / Impact Analyse Simplifying Decisions for Everyone.
Atos, Atos and fish symbol, Atos Origin and fish symbol, Atos Consulting, and the fish itself are registered trademarks of Atos Origin SA. August 2006.
Deltion College Engels C1 Spreken [Edu/003] thema “Oprah at Deltion” can-do : kan duidelijke, gedetailleerde beschrijving geven van complexe onderwerpen,
Requirements -People are able to make their own memorial page, called a memori -The website will be build first in Dutch for extension.nl, then copied.
Een alternatief voorstel Naar aanleiding van bestudering van de IAASB voorstellen denkt de NBA na over een alternatief. Dit alternatief zal 26 september.
Social Technographics Hoe ontwikkel je een succesvolle social media strategie? Reineke Reitsma Director, Consumer Technographics Forrester Research 11.
Deltion College Engels C1 Gesprekken voeren [Edu/002]/ subvaardigheid lezen thema: Order, order…. can-do : kan een bijeenkomst voorzitten © Anne Beeker.
Personal before business in requirements prior-IT-ization Johan F. Hoorn Vrije Universiteit Computer Science Information Management and Software Engineering.
1 Co-Design at Chess-iT Guus Bosman. 2 Afstuderen bij Chess Net.Footworks tot augustus 2003 Afstuderen augustus 2003 tot maart 2004 Chess full-time vanaf.
MASTERPROJECT M1 · Groep Equilibrium Marieke Steenbeeke Rick van Veghel Tim de Veen MASTERPROJECT M1 ZERO ENERGY BUILDING Previous weeks · Zero.
Hoogwaardig internet voor hoger onderwijs en onderzoek Amsterdam, 23 November 2005 Walter van Dijk SURFnet Development of LCPM decision-making models and.
ETHOS PROJECT: PROGRESS Follow-up & feedback end of year 1.
Teams on the frontline Geert Stroobant De Heide - Balans
PTC-AWARD – TOWELMACHINE – 10 NOV VENDOR – MMID - TOWELMACHINE.
Voorziening levensonderhoud Religieuze Instituten Paul Op Heij ‘s-Hertogenbosch, 25 september 2013 The future depends on what you do today.
Vaardig? Een spectrum aan vaardigheden! Van informatie- naar media- naar exploratievaardig? Of e-Research & e-learning literate? Collaboration literate??
Accessible Instructional Materials. § Discussion: Timely access to appropriate and accessible instructional materials is an inherent component.
Nieuwe wegen in ontwerpen met CAD
High quality internet for higher Education and Research 1 TF-LCPM: Exchanging new ideas New ideas within SURFnet Sharing with other NRENs
Corporate Communications February 2011 Succesvol met Outsourcing Gerben Edelijn, CEO Thales Nederland.
AGENDA Het programma start om uur en eindigt om uur met aansluitend een dinerbuffet tot uur. Er is voldoende ruimte om met uw collega.
Introducing SURFnet to CAUDIT Walter van Dijk Head Account Advising Department 6 October 2006.
Beyond Big Grid – Amsterdam 26 september 2012 Enquette 77 ingevulde enquettes, waarvan 60 met gebruikservaring = Mainly Computer Science.
SCENARIO BASED PRODUCT DESIGN
NWO-AB. 2/23 missie 3/23 RuG LEI NIOZ UT TUe ASTRON AMOLF TUD SRON + Veel colleges, masteropleiding, onderzoeksschool (80 PhDs) samenwerking.
1 HOORCOLLEGE Customer Relationship Management
Woensdag 23 juli 2014 volgende vorige algemeen ziekenhuis Sint-Jozef Malle Dementia pathway: a condition specific approach Patrick De Wit, MD Thierry Laporta,
In samenwerking met het Europees Sociaal Fonds en het Hefboomkrediet The role of APEL in career coaching and competence management Competence navigation.
Software Engineering Sommerville, Ian (2001) Software Engineering, 6 th edition Ch.1-3
ontwik idee - keling dag 3 goals today Develop “criteria” to help you evaluate & select your ideas Some tools from Tassouls book to help you do this.
Enterprise Application Integration Walter Moerkerken Ilona Wilmont Integratie Software Systemen 8 mei 2006.
IOP and Vrije Universiteit1 Example of bad interface  Windows: Use Start to Stop.
De digitale coach Het verbeteren van een plan van aanpak Steven Nijhuis, coördinator projecten FNT Deze presentatie staat op:
Pakketgebruik Winston Evans.
Bedrijfsspecifieke extensies Standaard Rekeningschema
Vrije Universiteit amsterdamPostacademische Cursus Informatie Technologie Universal Modeling Language … why you need models? Models are necessary to communicate,
Automation SolutionsMFG/Pro Dutch usergroup 8 februari 2007 ISA S88 & S95 Het gebruik van deze normen in de productie.
Tussentoets Digitale Techniek. 1 november 2001, 11:00 tot 13:00 uur. Opmerkingen: 1. Als u een gemiddeld huiswerkcijfer hebt gehaald van zes (6) of hoger,
From computer power and human reason. Joseph Weizenbaum.
Geheugen, distributie en netwerken Netwerken: de basis voor distributie van gegevens en taken (processen) –bestaan zo’n 40 jaar, zeer snelle ontwikkeling.
Organizing Organization is the deployment of resources to achieve strategic goals. It is reflected in Division of labor into specific departments & jobs.
Ontwikkeling van een organisatie door evolutie en revolutie
Deltion College Engels C1 Schrijven [Edu/002] thema: CV and letter of application can-do : kan complexe zakelijke teksten schrijven © Anne Beeker Alle.
Deltion College Engels B1 Gesprekken voeren [Edu/005] thema: applying for a job can-do : kan een eenvoudig sollicitatiegesprek voeren © Anne Beeker Alle.
Deltion College Engels C1 Gesprekken voeren [Edu/004]/ thema: There are lies, damned lies and statistics... can-do : kan complexe informatie en adviezen.
Deltion College Engels B2 Schrijven [Edu/004] thema: (No) skeleton in the cupboard can-do: kan een samenhangend verhaal schrijven © Anne Beeker Alle rechten.
Deltion College Engels B1 En Spreken/Presentaties [Edu/007] Thema: Soap(s) can-do : kan met enig detail verslag doen van ervaringen, in dit geval, rapporteren.
Deltion College Engels En Projectopdracht [Edu/001] thema: research without borders can-do/gesprekken voeren : 1. kan eenvoudige feitelijke informatie.
Deltion College Engels C1 Spreken/Presentaties [Edu/006] thema ‘I hope to convince you of… ‘ can-do : kan een standpunt uiteenzetten voor een publiek van.
Deltion College Engels B1 Schrijven [Edu/004]/ subvaardigheid lezen thema: reporting a theft can-do : kan formulieren waarin meer informatie gevraagd wordt,
© Copyright VIMC 2009 Telecom Expense Management A Discussion Ed Vonk
Rational Unified Process RUP Jef Bergsma. Iterations –Inception –Elaboration –Construction –Transition De kernbegrippen (Phases)
Blended Learning. content Waarom wij e-learning hebben gebruikt Demo van de module Voorlopige resultaten van effecten op gebruikers.
Ontbijtsessie 2 juli 2014 Kwaliteitsverbeteringen in Infra Projecten.
Combining pattern-based and machine learning methods to detect definitions for eLearning purposes Eline Westerhout & Paola Monachesi.
EML en IMS Learning Design
Benjamin Boerebach, Esther Helmich NVMO workshop 12 juni 2014.
Link Popularity Het principe van linkpopulariteit kun je als volgt samenvatten: hoe meer webpagina's er naar een bepaalde webpagina linken, des te belangrijker.
TRENDS and impact on your Business
Sustainable employability in Tourism The human factor October 24, 2014 Where Europe Meets the Americas.
Ondernemer in de btw René N.G. van der Paardt. Met Fuchs is de grens van het ondernemerschap wel bereikt? De vaste inrichting in de btw zou hetzelfde.
Het geheim van Linked Data Marcel ReuversGeonovum CB-NL 20 november 2014.
WISKUNDIG MODELLEREN KUNST OF KUNDE? 11 november 2009 Jaap Praagman CQM.
The Research Process: the first steps to start your reseach project. Graduation Preparation
Key Process Indicator Sonja de Bruin
Finance Matters CoP Case studies
IBM Software A vehicle manufacturer deploys business rules in one hour instead of a week IBM Operational Decision Manager software helps speed new business.
Transcript van de presentatie:

Selection and decision-making criteria for a Distributed Control Systems in the process industry Willem D. Hazenberg Senior Process Control Consultant Stork Industry Service MBA Researcher Newport International University

Inhoud Intro & Framework Main objectives – Study and research questions Research project methodologie Customer Value Proposition Methodic: Multi attribute utility theory Main- and Sub sections Big- Short- Final list Business reason Economic Profile (EP) Conclusions (Dutch) More info – next steps

At Controls Manufacturing Community List Dear All   Can anyone send me a single page comparison or presentation on PLC Vs DCS as on today's date? I shall be thankful for your kind inputs. Thanking you, Regards, (Name removed) Control System Staff Engineer

Introduction To partial fulfillment of the requirements for the degree of Master of Business Administration in Information Management at the Newport Business Academy and Newport International University, I decided to work out a thesis proposal with the title “Selection and decision-making criteria for a Distributed Control Systems” in the process industry.

The project framework (1) For the control of the chemical processes in the process “chemical” industry Distributed Control systems (DCS) are applied. These systems are the heart- and nerve system within these factories. The choice of DCS for a concern is a matter of strategic importance. High demands are made to the availability of a DCS and if the concern made a choice, she is committed to it for a lengthy time. Replacing a DCS is a very valuable matter because of the arisen production loss at a reconstruction for example. The service costs of a DCS could be a multiple amount of the initial investment during the life span.

The project framework (2) The process industry in the world for approximately spends 65 billion dollar per year at the top 50 suppliers on process control systems (included DCS). (2006 data) The expenses of these investments often amount to more than 1 million Euro by per system. The selection process generally varies from 12 up to 24 months. At large DCS projects there sometimes are investments of more than 45 millions Euro. The total expenses, which are involved with the selection of one investment, amount more than 100,000 Euro per system. To earn an order, the marketing/ sale expenses generally are more than 50.000 Euro at a supplier.

The project framework (3) Local employees of the establishments are involved frequently in the choice for a system. Because of the fact that this investment only takes place every 10-17 years, they are lacked from experience and methods to be able to take this kind of decisions. The consequence is that the choice for a certain system is not always univocal at this moment and the relation between a business case, a chosen solution, and the selection process isn’t always there. This study has to contribute that we make the choice of a system in a more univocal way and the decision-making becomes more transparently.

Purchasing a DCS system Politics ISO With First Draft Of Competency Model

Main objectives The goals of this research is: The improvement of model-based consideration concerning a selection of a new distributed control system (DCS), by making an analysis of selected criteria within the “chemical” industry to choose a DCS and to establish an investment/ selection model with these insights/ ideas. So that future investment can be bought faster and the decision-making will be more transparent.

Study Define the core selection criteria and their priorities for the purchase of a Distributed Control system (DCS) in the chemical industry and a design a decision-making model so that the decision-making for new systems more balanced more consequent and faster can be carried out. Interview employees who are involved in the purchase decision of DCS within large DCS using companies like Alcoa, Akzo Nobel, BP, Dow, Dupont, Exxon Mobil, DSM, Lyondell, P&G, Sabic, Shell etc. Also account managers and marketing managers of the chosen DCS have to be involved in this research.

The areas of the study (1) What is the business case of your investment in a new DCS system? What is the reason for this investment (migration, replacement or a new installation) and what are consequences of the choice of system? Which DCS supplier knows the person who is concerned in the company purchase of a new system? What decides whether the DCS supplier comes on the Big List for further evaluation? What decides whether the DCS supplier comes on the Short List for further evaluation?

The areas of the study (2) Which staff functions are involved in the selection? At which components do these people pay attention and which priority do they give to the different components? Is there a difference between the ideas of DCS suppliers and users concerning these criteria?

Research project methodologie Documents review more then 1000. Online research (WWW.DCSSELECT.EU) 167 respondents: End Users Engineers, Purchasing, line management and DCS vendors VP, Service – Account- marketing managers and Business consultants Across industries in 39 different countries: EMEA, Australia, America, Far east Working for organizations ranging from: End Users – SI, Engineers Company’s, DCS vendors Various industries:

Return Received survey documents End users

Involved Others

Organization relation to DCS Input up to 23 mei 2009

End User industry segment Organization relation to DCS

Job Title respondent

Reason last DCS project

Project size

Is your company a Technology trendsetter or more a follower? When you buy hardware or software for a DCS system you will buy it at?

DCS Customer Value Propositions Decision Framework: Because no enterprise in pursuit of market leadership can excel simultaneously in product superiority, operational efficiency and customer intimacy (unless it has unlimited resources), there are trade-offs to be made. DCS Customer Value Propositions Product Superiority C 11,6% / V = 4,0% C = End user V = DCS vendor Best Product Best Product at Best Time/Cost C 45,3% / V 36,0% High Touch and Best Product C 12,8% / 28,0% Enterprise Resource Trade-Off Best High Touch Best Time/Cost Customer Intimacy C 1,2% / V = 4,0 Operational Efficiency C 24,4% V 12,0% Source: Adapted from M. Treacy and F. Wiersema Best Time/Cost Plus High Touch C 4,7% / V 16,0% Key Issue: How will organizations develop and implement a business vision for CRM? In 1995, M. Treacy and F. Wiersema’s stated in their book “The Discipline of Market Leaders” that enterprises that use a business strategy to emerge as market leaders excel in at least one of the following three value disciplines, and are as good as the competition in each of the others: 1) operationally excellent, meaning that their back-office operational systems and processes are so good that they have a cost advantage; 2) product leaders, meaning that they drive the market on the strength of their products, giving them a unique product or service offering; or 3) customer-intimate, meaning that they are so close to the customer and establish such a strong relationship that the customer has no desire to buy elsewhere. All enterprises tend to pursue some combination of these traits; none can master all three disciplines unless it has unlimited resources. Lessons can be learned from the model that can be applied to CRM. The trap many enterprises fall into is in equating customer intimacy with CRM when, in reality, the customer may not value intimacy and may set a higher value on a low price or a superior product. Action Items: Enterprises in pursuit of CRM will identify the balance of needs by each customer segment in the areas of product superiority, time- and cost-based competitiveness, and customer intimacy. CRM project-sponsoring business executives should be able to clearly articulate how each customer segment will value its purchases.

AHP-Maut (Analytical Hierarchy Process en Multi attribute utility theory) Methodic Result = Score * Weights of importance Global variable 1 Local variable 1 Local variable 2 Sub variable 1 Sub variable 2 Local Variable 3 Bron Schmitt D, THE MAUT MACHINE : An Adaptive Recommender System

De AHP procedure Stap 1 Constructie van de hiërarchische structuur Bepaal business - projectdoel Stel een besluitvormingscommissie samen (DMU) Bepaal de selectiecriteria Bepaal de selectie alternatieven (leveranciers) Stap 2 Individuele evaluatie van de criteria Doormiddel van paarsgewijze vergelijking Stap 3 Individuele evaluatie van de alternatieven Stap 4 Integratie van de individuele analyse resultaten De uitkomst van deze methode is een rangorde van de alternatieven.

DCS Selection main groups

Capable of serving a purpose well

Alarm management

AVG Score main items DCS Selection

Business reason Big list selection 2009 Knock – out criteria 40,3% Knock – out criteria 13% Knock – out criteria 10,1% Knock – out criteria 11,8% Knock – out criteria 12,8% Knock – out criteria 12,0% Knock – out criteria 21% Knock – out criteria 13,3% Knock – out criteria 13,3% ……………………………Knock – out criteria 12% Knock – out criteria 13,7% Knock – out criteria 10,8% Knock – out criteria> 10% shown

Business reason Final selection 2009 Knock – out criteria> 10% shown

Business case reason Migration Big list 56,4% Could not maintain old system; 43,6% Replace obsolete system; 23,1% Create a more cost-effective process; 23,1% Reduction in Equipment maintenance; 20,5% Removed of manual processes. Short list 30,8% Could not maintain old system; 25,6% Replace obsolete system; 25,6% Efficient workflow; 23,1% Use of advanced control algorithms. Final list 33,3% Could not maintain old system; 25,6% Higher production; 23,1% Improved product Yield; 23,1% Improve loop control; 20,5 Replace obsolete system; 20,5% Use of advanced control algorithms. Conclusie: De belangrijkste businesscase redenen is en blijft een obsolete systeem.

Business case reason new system Big list 41,7% Improved automation; 33,3 % Business information to the plant floor; 33,3% Higher production. Short list 33,3% improved automation; 27,1% Increase real-time decision making; 25,0% Use of advanced control algorithms; 14,6 % Business information to the plant floor; 14,6% Higher production. Final List 33,3% Improved automation; Conclusie: De belangrijkste businesscase redenen variëren dus per fase.

Selection criteria in Phase

Most important at biglist Viability Job - function Big list Barriers to exit costs Business case guaranty from DCS vendor Main Selection item

Most important at short list Job- function Short list Vision DCS vendor Functionality Implementation process Technology Interoperability User Experion Main Selection item

Most important at Final list Services Training Job - function Final list Documentation Initial costs Ongoing cost Main Selection item

Importance of Business case reason Use of advanced control algorithms Improve Automation Replace obsolete system Could not maintain old system

Zoom in op verschillen > 5 jaar Prio 1 DCS End users 20/90 = 22,2% DCS Vendor 6/25 = 24,0% Account managers Prio 2,5,6,7,8 (n=5) Sales en Marketing's dep. Prio 1,2,3,4,6,8 (n=13) Eng Comp. 1/12 = 8,33% System Integrators 2/7 = 28,6%

Economic Profile (EP) EP = Life Cycle Benefits (LCB) - Life Cycle Cost (LCC) LCB = NPV YEL (Annual Manufacturing Cost savings + Annual Production Increases) LCC = System Price + Initial Eng. Cost + NPV YEL = Annual Eng. Cost + Annual Ops costs + Annual Maint. costs) Annual Ops. Cost Software licenties (aanschaf, licentiekosten voor uitbreidingen) Onderhoudscontract, remote onderhoud Investeringswaarborgen (lange termijnondersteuning, migratie en softwarebescherming) Betrouwbaarheid (Hardware, software en configuratie) Complexiteit (topologie, software, procedures) Kennis (Training, toepassing, ondersteuning) Down time (van productie installatie) ( het niet kunnen produceren doordat systeem niet beschikbaar is) Yel = Years of Expected life

Live cycle Cost Op basis onderzoek 1996 (data 1991-1996) Source ISA Source: Ken Keiser en Todd Stauffer levenduur DCS componenten 2007 intech Model Woordward 1997 Systeemprijs Initiële engineerings- kosten Installatie kosten Jaarlijkse engineerings kosten Jaarlijkse operationele kosten (OPS) Jaarlijkse onderhoudskosten Gemiddelde percentage kosten eerste 5 jaar 23,2% 28,5% 16,1% 9,3% 7,6% 15,3% Op basis onderzoek 1996 (data 1991-1996) Source ISA

Migration Yes / No Difference life cycle components Best offer Standard migration Obsolescence equipment Withdrawn and/or not supported by vendor Risks assessment Postponement period Risk management Plant integrity

Migration Risk v.s. Benefits

Conclusies Migraties en vervangingen van een DCS systeem worden veel meer gedreven door de angst voor een obsolete systeem dan door de terugverdiencapaciteit en betere besturing of andere functionele mogelijkheden van een nieuw systeem. Zoals bijv. zaken zoals procesverbeteringen en hogere productie.

Een groot percentage DCS en ICT-projecten haalt niet succesvol de eindstreep, de businesscase wordt niet gehaald, de projectduur is langer en de kosten zijn hoger als oorspronkelijk bepaald. De hoofdredenen zijn het onvoldoende functioneel te specificeren van de projecteisen en tussentijdse wijzigingen.

Vroegtijdig inspelen op de specificaties geeft maximale manoeuvreerruimte voor besparingen (dan wel minimale kosten voor een verandering) daarnaast is het vroegtijdig bestrekken van inkoop in de specificatiefase een kostenbesparing en zou je hiermee zo vroeg als mogelijk hiermee moeten beginnen. Doordat er een tekort aan deskundige (interne) mensen is, zal het verstandig zijn om een externe consultant in te huren om te helpen in de startfase van het project om deze besparingen ook te realiseren.

Uiteindelijk wordt dit de keuze Dat de beste keuze een systeem is waar de sterkten van het systeem overeenkomen met de behoeftes van de plant. Dat is altijd beter dan een systeem dat bijna alles kan, maar de belangrijke zaken voor de plant niet; ”Die leverancier te kiezen die voor de onderneming op lange termijn het geringste risico vormt. Door het kleinste risico te combineren met de met de hoogste (tevredenheid) score op de selectiecriteria resulteert in een aanbeveling voor die betreffende leverancier”.

Het zijn de mensen die het doen, zowel in de selectie als in de implementatie en onderhoud, zorgvuldige selectie van de juiste teams is dan ook belangrijker dan veel technische aspecten.

End Willem.Hazenberg@dcsselect.eu Willem.hazenberg@Stork.com Website Contact information for more information Willem.Hazenberg@dcsselect.eu Willem.hazenberg@Stork.com Website WWW.DCSSELECT.EU 1e results http://www.dcsselect.eu/RES_ENDUSER/_frame.htm Concept Thesis http://www.dcsselect.eu/Concept%20Thesis.htm