Sprint 4 Deliveries Project 1 – Web development. Last lesson (Monday 27 October)  During the lesson, each group presents its product to the rest of the.

Verwante presentaties


Presentatie over: "Sprint 4 Deliveries Project 1 – Web development. Last lesson (Monday 27 October)  During the lesson, each group presents its product to the rest of the."— Transcript van de presentatie:

1 Sprint 4 Deliveries Project 1 – Web development

2 Last lesson (Monday 27 October)  During the lesson, each group presents its product to the rest of the class  Approximately 20 minutes (MAX 30) per group  Show also the short film with opinions of possible users about your website

3 Suggesties voor de presentatie (1)  Een of twee studenten presenteren  Een student zorgt voor de bediening van de pc/ laptop  Zorg dat de benodigde VGA-kabel er is (kun je lenen bij uitleenbalie 1 e verd. Wijnhaven 99)  Zorg dat je de presentatie geoefend hebt.

4 Suggesties voor de presentatie (2)  Richt je op de product owner  Show je werkende site, geen printscreens van de site  Stel de groepsleden voor  Ga niet uitgebreid vertellen wat de opdracht was  Geef aan wat de focus van de klant was bij deze opdracht  Ga over op een live demo van de site  Zorg dat je vloeiend kunt laten zien welke functionaliteiten er zijn  Zorg dat je dit van tevoren goed geoefend hebt (inspelen knoppenbediener op presentator)

5 Deliveries (by Sunday 26 October)  Inside the SPRINT 4 folder  Screenshot of Trello scrumboard  Burndown chart of sprint 4  Slides for the presentation + Short film  Product backlog (only the items actually implemented by your product)  Zipped folder with the code  URL of your website  Suggestion  Name all your files “INF1B – Group X – xxxxx”  For example, “INF1B – Group 1 – Trello.png”, “INF1B – Group 1 – Code.zip”, “INF1B – Group 1 – URL.txt”, etc…

6 Evaluation  The last sprint gives 0 OR 3 points, both for individual and for team  Team grade based on product & presentation  Individual grade based on proactive behaviour, punctuality, involvement, reliability  Criteria for product (website) evaluation  Usability  Hoe gebruiksvriendelijk is de website?  Look & Feel  Hoe ziet de website eruit en komt het overeen met de gemaakte afspraken met de opdrachtgever?  Features  Hoeveel features vanuit het product backlog zijn gerealiseerd?  Complete  Hoe compleet is de website en werkt het volledig naar behoren?

7 Evaluation  “MUST-HAVE” list of items  reserveren stoelen (1)  plaatsen selecteren + drukken op reserveringsknop drukken + bevestigen van de reservering; de data hoeft niet lokaal te worden opgeslagen  algemene bioscoopinformatie (2)  overzicht huidige films (4) en toekomstige films (5)  gebruiksvriendelijke (7) en moderne site (8)  filmtrailers (11)  detailpagina per film (12)  totaalkosten stoelreservering (14)  ontvangst reserveringscode (15)  overzicht beschikbare stoelen en prijzen (21)  google maps locatie bioscoop (28)