INSTRUCTION INSTALATION LOADBALANCER Direct measurement 669010 0-32A 669015 32-63A Indirect measurement 1
2
V3.0 Safety regulations Before you install the charging station, you must make sure the location is safe for all bystanders. NEVER allow children onto this worksite. Never allow ANYONE who has nothing to do with the work onto the worksite. Never be distracted while you are performing the work. Make sure you maintain a healthy posture at all times while doing the work. Do not leave any tools or charging station components unattended. Make sure any tools you are using are clean and dry. Make sure that the charging station, tools and components will stay dry when it is raining. 2
3
Choose your Ecotap Load balancer type 669010 0-32A 669015 32-63A Direct measurement Indirect measurement 3
4
Choose meter type 4
5
WiringSettings Choose installation type 5
6
WiringSettings Choose installation type 6
7
Direct measurement Step 1 Direct measurement 669010 0-32A 669015 32-63A 123 mm 80 mm 201 mm 7
8
Direct measurement Groups Power in L1 L2 L3 N PE Groups Power in L1 L2 L3 N PE 45 6 N 1 2 3 N Type 1 six wires + N x1 8 Type 2 six wires + N x2
9
Direct measurement 9
10
10
11
Indirect measurement Coils not included Step 1 11
12
Indirect measurement SDM60MCT V2 12
13
Indirect measurement L1 L2 L3 N 13
14
Indirect measurement Groups Power in L1 L2 L3 L1L2L3 P2 P1 P2 P1 P2 P1 14
15
Indirect measurement Max 2 m L1 L2 L3 S1 15
16
Indirect measurement Max 2 m L2 L3 S2 L1 S2 16
17
Indirect measurement 120Ω A B G B A 17
18
Indirect measurement 18
19
Indirect measurement L1 L2 L3 N 19
20
20
21
Indirect measurement 21
22
Indirect measurement 22 The Ecotap load balancer works with the following settings. BAUDRATE:9600 ADRESS:3 PARITY:NONE STOPBIT:2 * CT2:Depending on the coil * CT-RATE:0001 * Pay attention! these settings can only be adjusted once !
23
Indirect measurement 23 0000 PASS 000 1 Hold down 3 sec
24
Indirect measurement 24 PASS 000 1 Hold down 3 sec
25
Indirect measurement 25 SET addr 001 Skip Adress setting RS485 / Mbus primary Addres Hold down 3 sec
26
Indirect measurement 26 SET addr 01 SET addr 0 1 0 Hold down 3 sec
27
Indirect measurement 27 SET Addr 00 3 SET Addr 00 3 Hold down 3 sec
28
SET addr 003 Indirect measurement 28 SET addr Good
29
Indirect measurement 29 SET Baud 9.6 Set Baud Skip Baudrate setting 9.6 Baud Rate range for Modbus Hold down 3 sec
30
Indirect measurement 30 SET Baud Set Baud good Hold down 3 sec
31
SET Baud 9.6 Indirect measurement 31
32
Indirect measurement 32 Set Parl none Skip Parity setting Set PARl Parity Hold down 3 sec
33
Indirect measurement 33 Set Parl Set PARl GOOD Hold down 3 sec
34
Indirect measurement 34 Set Parl none
35
Indirect measurement 35 Set Stop 2 Skip Stopbit setting Set Stop 2 Stop BitsNote: Only when the parity is NONE, the stop bit can be changed to 2 Hold down 3 sec
36
Indirect measurement 36 Set Stop Set Stop GOOD 2 Note: Only when the parity is NONE, the stop bit can be changed to 2 Hold down 3 sec
37
Indirect measurement 37 Set Stop 2 Note: Only when the parity is NONE, the stop bit can be changed to 2
38
Indirect measurement 38 Set Ct2 Set Ct2 5 Skip CT2 setting Secondary current (1A or 5A) 5 Hold down 3 sec
39
Indirect measurement 39 Set Ct2 good Set Ct2 5 Set Ct2 5 Hold down 3 sec
40
Indirect measurement 40 Set Ct2 5
41
Indirect measurement 41 Set Rate 0001 Skip RATE setting Hold down 3 sec
42
Indirect measurement 42
43
Indirect measurement 43 Set Rate 001 Set Rate 0 01 0 100 ÷ 5 = 20
44
Indirect measurement 44 Set Rate 00 1 Set Rate 002 2 100 ÷ 5 = 20 Hold down 3 sec
45
Indirect measurement 45 Set Rate good Set Rate 0020
46
Indirect measurement 46 Secondary voltage (100V to 500V) Set Pt2 400 Skip
47
Indirect measurement 47 Pt Rate 0001 Energy represented by each pulse Skip
48
Indirect measurement 48 Pulse output Set rly Skip
49
Indirect measurement 49 Energy represented by each pulse Set Rate 001 Skip
50
Indirect measurement 50 SET Puls 200 Skip
51
Indirect measurement 51 Current and power readings intehrated for maximum demand measurements in minutes Set Dit 60 Skip
52
Indirect measurement 52 Backlit lasting time Set LP 0 Skip
53
Indirect measurement 53 Type of power supply being monitored SYS 3p4 Skip
54
Indirect measurement 54 Reset the maximum demand value of current and power CLr Skip
55
Indirect measurement 55 Set new passcode Set Pass 1000 Skip
56
Indirect measurement 56 Revurse connected current inputs correction set-up Set Sys cont Skip
57
Indirect measurement 57 0000 004.3 Check if the coils are connected correctly
58
Indirect measurement 58 0.043 -0.043 If the minus sign appears before a number, that coil is incorrectly connected to the S1 and S2 L1 L2 L3 S2 S1 L3 Check if the coils are connected correctly
59
Indirect measurement 59
60
Indirect measurement Step 1 Coils not included 60
61
Indirect measurement 11-1- 2- 4- 5- 7- 8 C-B-A 3 6 9 N L1 L2 L3 61
62
Indirect measurement Groups Power in L1 L2 L3 L1L2L3 P2 P1 P2 P1 P2 P1 62
63
Indirect measurement Max 2 m L1 L2 L3 S1 63
64
Indirect measurement Max 2 m L1 L2 L3 S2 64
65
Indirect measurement 120Ω B A 65
66
Indirect measurement L1L2L3NPE L1L2L3NPE S1 S2 P1 P2 C1 S1 S2 P1 P2 C2 S1 S2 P1 P2 C3 11-1-2-4-5-7-8 C-B-A 3-6-9 ADRE SS 3 128128 66
67
L1 L2 L3 Indirect measurement 11-1- 2- 4- 5- 7- 8 C-B-A 3 6 9 N 67
68
Indirect measurement 68
69
Indirect measurement 69
70
Indirect measurement 70
71
Indirect measurement 123 L3 71
72
Indirect measurement 123 S2 S1 L2 72
73
Indirect measurement 123 CtrAt 73
74
Indirect measurement 123 5-5 74
75
Indirect measurement 123 # # # - 5 75
76
Indirect measurement 76
77
Indirect measurement 123 100 - 5 77
78
Indirect measurement 11-1- 2- 4- 5- 7- 8 C-B-A 3 6 9 N L1 L2 L3 78
79
Indirect measurement 11-1- 2- 4- 5- 7- 8 C-B-A 3 6 9 N L1 L2 L3 79
80
Indirect measurement 80
81
Kruisbroeksestraat 23 5281 RV Boxtel Netherlands +31 (0) 411 – 210 210 info@ecotap.nl www.ecotap.nl 81
Verwante presentaties
© 2022 SlidePlayer.nl Inc.
All rights reserved.