De presentatie wordt gedownload. Even geduld aub

De presentatie wordt gedownload. Even geduld aub

BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling.

Verwante presentaties


Presentatie over: "BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling."— Transcript van de presentatie:

1 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) MULTI-PURPOSE FLOATING UNIT REVOLUTIONARY INVENTION FOR THE OFFSHORE INDUSTRY ENHANCED BY THE APPLICATION OF ULTRASONIC PEENING TECHNOLOGY BUITENDIJK HOLDING BV– The Netherlands IS THE OWNER OF THE INTERNATIONAL PATENTS FOR THESE TECHNOLOGIES.

2 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) MULTI-PURPOSE FLOATING UNIT TRANSIT MODEOPERATIONAL MODE VESSEL HULL CONSISTING OF 2 COLUMNS AT EACH BOW GUIDING A JACKING DECKHOUSE

3 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) MULTI-PURPOSE FLOATING UNIT DESIGN BASES Design based on currently used offshore technology The concept combines the technical advantages of 3 different types of existing units: The vessel shaped hull allows fast transit and/or high storage capacity. The semi-submersible for a superb operational heave behaviour. The jacket unit adjusts to air-gap needs. The design includes a large amount of accommodation and recreation space according to DNV, DEA and NMD requirements. The design include a high deck load capacity so the concept is, when required, multi-purpose.

4 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) HIGH STRENGTH STEEL TREATED WELDS BY ULTRASONIC PEENING ALLOWS INCREASED PAY-LOAD AND IMPROVED FATIGUE RESISTANCE

5 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) Standard High Tensile Steel parts: Hull Bottom Side Top Bulkheads Decks Girders Ultra High Tensile Steel parts: Deckhouse 4x Columns Mid column Derrick Helideck Inside hull: double bottom deck Stiffening

6 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) MULTI-PURPOSE EXPLORATION VESSEL OPTIMUM REQUIREMENTS FOR DEEPWATER Own propulsion: In transit it would be able to sail with speed up to 15 knots and in operational mode full stationkeeping capabilities. In operational mode the motion behaviour would be equal or better as in a semi-submersible; a system which allows to work with a fixed Riser system able to operate in heavy weather reducing dramaticaly the occurrence of operational downtime. High storage area’s to reduce logistical cost and preferably have a relative low Vertical Center of Gravity to maintain stability requirements. Vessel must be outfitted with sufficient equipment to handle all standard operations.

7 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) MULTI-PURPOSE VESSEL FOR ULTRA DEEPWATER OPERATIONS IT COULD BENEFIT: Oil Company’s Drilling Company’s FSO and FPSO company’s DUE TO THE DIVERSIFIED CHARACTER OF THE CONCEPT

8 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) CONCEPT DESIGN PREMISES (1) Additional doublehull mid-column acting as moonpool below the derrick; in the mid-column’s doublehull the casings, drillpipe and risers will be transported vertically by conveyor systems into the derrick. Vertical storage in hull of up to 4000 meter (13000 ft.) risers, drillpipe and casing; stored by cranes through the columns at the bow’s. DP class 3 classification; large added mass – negligible heave; low overall Vertical Center of Gravity – adjustable by ballast tanks to optimise stability and GM. Adjustable buoyant module in moonpool to reduce and control loads on the toptension system. Ballast tanks: seawater can be replaced by crude oil. Deck cranes: sufficient capacity to handle all operations like installation of templates, loading and unloading risers etc...

9 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) CONCEPT DESIGN PREMISES (2)

10 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) DIMENSIONS (1)

11 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) DIMENSIONS (2) Length (m): 240 Width (m): 52 Depth hull (m):31 Transit Draft (m):15-24 Drydock draft (m):11 Adjustable GM (m):1-3 Airgap (m):15-20 Cranes:2x 150 Ton-45 m. 4x 70 Ton-25 m.

12 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) ARRANGEMENT (1)

13 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) ARRANGEMENT (2) Beds Galley Messroom Recreation rooms Change rooms Compartments for: Baryte Cement Brine Baseoil Mud storage Mudpits Mixing Aux. Engine Emerg. Gen. Sewage Treat. Waterrmakers HVAC

14 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) ARRANGEMENT (3)

15 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) ARRANGEMENT (4) Compartments in hull for: 4x engine room 2x pumproom 4x switchboardroom 4x thruster room Sewage treatment Watermakers HVAC Recreation Sewage treatment Machine shops Stores Separator rooms + tanks Ballast water: 1 million barrel Vertical storage of :Casing/Drillpipe 4000 mtr. riser

16 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) CAPACITIES Design speed:12-15 Knots Workdeck storage:*8.000Ton Lightweight appr Ton Submerged appr Ton Engine rooms:4 x 10M Thrusters:8 x Station keeping by DP class 3. Vessel operating in headseas. Controlable load on Toptension syst. Operational at 10 year storm

17 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) MOTION BEHAVIOUR TEST (1) submerged mass in relation to the relative small waterline area results in negligible heave motion Basin at UNO-USA The model scale 1:150 Hooked up and ready for test A North Sea 10 year storm was used as wave spectra as well as random waves and soft-moored in headseas to determine RAO’s. Results were compared with results from regular waves.

18 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) MOTION BEHAVIOUR TEST (2) Slow-motion presentation of 10 year storm HEAVE IS NEGLIGIBLE AND PITCH IS MODERATE SLAMING AGAINST MID- AND BOW COLUMNS AS PREDICTED IMPROVED SHAPE OF THE COLUMNS TO “ WAVEBREAKERS” HEAVE RAO: HEAVE IN 10YEAR STORM UP TO WAVEPERIODS OF 12 SEC. NEGLIGIBLE < 0.1 m/m IN STORMS PERIODS ARE SELDOM LARGER THAN 12 SEC NO SIGNIFICANT OPERATIONAL DOWNTIME DUE TO WEATHER WILL OCCUR

19 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) LOADS ON TOPTENSION SYSTEM (1) Load Fv is approx. 80% static and approx. 20% dynamic Load Ft fluctuates due to dynamic load. Load Fh is causing unequal loads Ft.

20 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) LOADS ON TOPTENSION SYSTEM (2) The sum of fluctuating load Ft results in the need for a toptension system which is able to react fast on load changes. Taking into account the always action static load a huge powerconsuming toptension system is required. It would be ideal to reduce the static load and Fh.

21 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) TOPTENSION CONTROLABLE LOAD DEVICE (1)

22 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) TOPTENSION CONTROLABLE LOAD DEVICE (2) THE RISER SYSTEM IS CONNECTED TO THE BOUYANT MODULE BOUYANT MODULE IS ABLE TO SLIDE VERTICAL BY WHEELS THROUGH THE MOONPOOL HORIZONTAL REACTION FORCES Fh FROM THE RISER SYSTEM WILL FLOW INTO VESSELS HULL THROUGH THE WHEELS RESULTING IN PERFECT LINEAR VERTICAL LOAD FOR TOPTENSION SYSTEM AS THE BOUYANT MODULE IS PERMANENTLY SUBMERGED THE RESULTING OF IT’S BOUYANCY WILL CONSIDERABLY REDUCE THE OPERATIONAL VERTICAL TOPTENSION LOAD THE BOUYANT LOAD COULD BE ADJUSTED AS IN A BALLAST TANK

23 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) BALLAST TANK OPTIONS – FSO/FPSO -APPROXIMATE CAPACITY OF FILLED BALLAST TANKS BARRELS OF SEAWATER -THE VESSEL WOULD BE ABLE TOWORK AS EXPLORING DRILLING UNIT AND AS STORAGE OR PRSTORAGE AND PRODUCTION UNIT: FSO/FPSO – ALLOWING A STORAGE CAPACITY OF BARRELS OF CRUDE OIL. - -IMPLEMENTATION OF SUBMARINE TECHNOLOGY WILL ALLOWS MULTIPLE USE OF BALLAST TANKS.

24 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) MULTIPLE OPTIONS EXPLORATION DRILLING UNIT PRODUCTION DRILLING UNIT FSO FPSO – By installation of production facilities on the workdeck PIPELAY VESSEL S-lay or J-lay CRANE VESSEL

25 BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling and Drilling Lindtsedijk 78 PO Box AG Zwijndrecht The Netherlands Phone +31 (0) Fax +31 (0) SUMMARY EXCELLENT MOTION BEHAVIOUR NEGLIGIBLE OPERATIONAL DOWNTIME MULTIPLE OPTIONS DOUBLE HULL DESIGN SELF-SUPPORTING EQUIPPED HIGH STORAGE FACILITIES


Download ppt "BUITENDIJK TECHNIEK SHF Cranes  Access Gangway Systems  Mechanical Engineering  Welding Positioners  Robot Welding  Machine Shop  Horizontal Milling."

Verwante presentaties


Ads door Google