De presentatie wordt gedownload. Even geduld aub

De presentatie wordt gedownload. Even geduld aub

12/12/2005 - 1 - Paperless Douane et Accijnzen Paul Raes, Programma manager geïntegreerde verwerking Douane en Accijnzen Roger Beeckman,projectleider Paperless.

Verwante presentaties


Presentatie over: "12/12/2005 - 1 - Paperless Douane et Accijnzen Paul Raes, Programma manager geïntegreerde verwerking Douane en Accijnzen Roger Beeckman,projectleider Paperless."— Transcript van de presentatie:

1 12/12/ Paperless Douane et Accijnzen Paul Raes, Programma manager geïntegreerde verwerking Douane en Accijnzen Roger Beeckman,projectleider Paperless Douane en Accijnzen

2 12/12/ Agenda >Stand van zaken –“Paperless Douane en Accijnzen” –Operationalisering “Paperless Douane en Accijnzen” >Registratie en Identificatie van Economische Operatoren

3 PLDA Stand van zaken >Analyse >SAD volledig –Web toepassing –B2G toepassing >Planning

4 12/12/ Analyse >Component registratie –Aantal beslissingen dienen nog te worden genomen –Component aangifte: –SAD aangifte afgerond: –Basis informatie verkregen vanwege experten –Ontbreken nog validatieregels >Financiële component: –Zo goed als afgerond –Aantal sub-componenten zijn reeds geïmplementeerd en uitgetest. >Goederenstromen of goederencomptabiliteit: –Analyse wordt beëindigd einde december –Stukken zijn reeds in ontwikkeling

5 12/12/ SAD Volledig – Web toepassing Upgrade 1e module wordt opgeleverd 09 januari 2006 >Voornaamste aanpassingen: –De horizontale en verticale scrolling wordt tot minimum beperkt –Een aantal drop downs worden toegevoegd –Bijkomende testen op niveau front end –Look en feel werd aangepast. >Mogelijkheden: –Insturen van een SAD aangifte (alle procedures en types) –Annuleren van een SAD aangifte –Wijzigen van een SAD aangifte

6 12/12/ SAD Volledig – B2G toepassing >De volgende versie’s van de MIG-’s zullen op 9 januari 2006 geïmplementeerd zijn: –SAD xml 1.8 –SAD EDIFACT uitvoer V1.6 >Let wel: bepaalde nieuwe velden worden niet gemapt –Een overzicht van deze velden zal op site worden geplaatst –foutmelding >Bijkomende publicaties: –Validatieregels zoals aanwezig in de versie van 9 januari 2006 –Correlatie tabel XML – EDIFACT – velden enig document >Mogelijkheden: –Zijn identiek aan de web toepassing.

7 12/12/ Planning - Pakket 1 “Paperless Douane en Accijnzen” 26/ / Pakket 1 Go Live Wk /01/ / / / / / / / / / / / / / / / / / / / Pakket 1 Module 1 update Pakket 1 Module 2.1 Pakket 1 Module 2.2 Pakket 1 Module 3

8 12/12/ Inhoud van de modules - module 1 update > Pakket 1 – Module 1 (update) -> 9 januari 2006: –SAD normale en vereenvoudigde procedure: insturen, wijzigen, annuleren berekeningen – Goederenstroom Customs events –Financiële comptabiliteit Klantenrekening (aanschrijven + borgen certificaten) Betalingen teruggaven

9 12/12/ Inhoud van de modules - module 2.1 >Pakket 1 - Module 2.1 -> 13 februari 2006 –Aangiften: Gegevensuitwisseling BIRB Verlegging inzake BTW –Goederenstroom: Summiere aangifte Write off (deel 1) –Financiële comptabiliteit Klantenrekening (deel 2) Ontvangen betalingen Kas functie

10 12/12/ Inhoud van de modules – module 2.2 >Pakket 1 – Module 2.2 -> 13 maart 2006: –Aangiften: NCTS aangiften Gecombineerde aangiften –goederenstroom: Write off (deel 2) transfers –Financiële comptabiliteit Bank statements

11 12/12/ Inhoud van de modules - module 3 >Pakket 1 – Module 3 – 15/04/2006 –Statistieken –Uitwisselen gegevens met andere autoriteiten

12 12/12/ Diversen >Wijziging bericht Lyst en afgeleiden ervan (luchtvracht) –Paswoord wordt vervangen door lysthouder ( = firma/magazijncode) >Quality review van de MIG’s >Opvolgen B2G >Alle informatie PLDA te bereiken via: –http://fiscus.fgov.be >Testen van B2G is heel belangrijk >Problem reports:

13 12/12/ Registratie en Identificatie van Economische Operatoren EORI

14 12/12/ Economic Operator Registration & Identification >Objective –Once only registration >Contribution to objectives Customs 2007 –Cooperation with other authorities –Facilitation of trade –Improvement of risk management and client insight –Stimulate and foster interoperability and synergy project in other area’s –Provide convergence framework for exchange of data between customs administrations for clearance of goods

15 12/12/ EORI - Deliverables >Study of the As-Is situation >Recommendation for the To Be solution >Requirements for the chosen To Be solution >System development >Process roll out

16 12/12/ Study of the As Is situation >Complete questionnaire –Contact person in the MS ? >Summary of the answers >Description of the As-Is situation

17 12/12/ Recommendation future registration system >Suggested general approach >Strengths and Weaknesses of the proposed solution(s)

18 12/12/ Requirements future registration system >Business requirements >System requirements >Legal requirements

19 12/12/ High level planning Oct 2005 Nov 2005 Dec 2005 Jan 2006 Feb 2006 Mar 2006 Apr 2006 May 2006 Jun 2006 Jul 2006 Aug 2006 Sept 2006 Oct 2006 Nov 2006 Dec 2006 Jan 2007 Feb 2007 Mar 2007 Apr 2007 Sept EORI E-Customs 2 1 Questionnaire 2 As-Is study 3 Recommendation 4 Requirements Summary answers questionnaire Proposal Recommendation preparation group Requirements ready for discussion meeting Stop/Go

20 12/12/ Preparation group Project organisation BE DE EE FR LT NL SE SK LU ES FI AT LV IR DK IT RO BG PT CZ PL HU SI GR UK TRG1 TRG2 TRG… TRG4 TRG3 TCG E-Customs TRG & EORI-WG CPG CYMT

21 12/12/ EORI Project group –BE Paul Raes, Sven Forster, Els De Pril –DE Stefan Wesp, Karin Birke, Uwe Herchenroeder, Matthias Schreier, Marianne Neumann –EE Tiia Lutsoja, Urve Remmik –FR Géraud de Bonafos –LT Sigitas Dobkevicius –NL Jos van den Berg –SE Roger Lündström –SK Ms. Barbara Lajzová –UK Dave Morgan

22 12/12/ The Trade Reference group >Limited number of participant: max 5 >Representative for the different segments of trade that could be considered from the point of view of registration and identification, i.e. 1.multinationals that have branches in different countries who are active on their turn in more than one country 2.operators acting in a centralized way 3.operators acting from distributed profit centers that do not have juridical independency 4.small and medium sized operators 5.operators established in one country only but with activities in clients and providers spread over many countries. 6.service providers: carriers, handlers, forwarders, customs brokers, … 7.….. >Project meeting of 19/1/2006 will make selection from the received proposals, trying to get a representative mix of the different segments

23 12/12/ TRG – expected contributions >Evaluation and comments on the as-is descriptions >Active Contribution and proposals for –the recommendation –the requirements

24 12/12/ TRG – resource estimate >Traveling and hotel cost for 2 times a full day (10:00 – 18:00) plenary meeting, possibly with break out groups on partial issues, in March and September An additional meeting before summer holiday might be necessary. This is to be evaluated on the Jan 2006 meeting. >20% – 40% FTE for electronic contribution on proposals: news groups, review of documents, … >Information sessions to trade groups you can be considered representative for the represented segment of trade, with feed back and reporting on results to the project group. >Contribution to the Trade Contact Group Briefings of April and November 2006: each 2 days preparation (1 man day for electronic exchange spread over 14 days and 1 day meeting) and 1 day for briefing

25 12/12/ To do >Who do you want to present for the trade reference group ? >Date due : 06/01/2005

26 12/12/ Reorganisatie van de processen

27 12/12/ Het proces - Invoer

28 12/12/ Het proces - Uitvoer

29 12/12/ Nieuwe organisatiestructuren

30 12/12/ Organigram – Gewestelijke Directie Centrum Directeur Mobiel toezicht Klant- behandeling Geschillen Vergunningen en audit Klantcoörd. En adm. En Bkh controle RegiekamerMobiel toezicht Doelgroepenstrategie Gegevensbeheer Doelgroepenbeheer

31 12/12/ Organigramme – Bureau Unique Directeur Enig Kantoor Afdeling Aagniftebeheer Afdeling Inning Helpdesk Team Ontvangsten Team Uitgaven en borgtochten Aangifte- behandeling Opvolging aangiften Jurist Reglementair bemiddelaar Toezichtsambtenaar Afsluiting en verificatie

32 12/12/ Gewestelijk Directeur Andere diensten betrokken bij de aangifte- behandeling Bureaux Laad en Losplaatsen Directeur Enig Kantoor Afdeling Aangifte- beheer Afdeling Inning Team Opvolging aangiften Bureaux Kantoren Inning Aangifte op papier Opvolging van de aangiften Nouvelle structure D&A

33 12/12/


Download ppt "12/12/2005 - 1 - Paperless Douane et Accijnzen Paul Raes, Programma manager geïntegreerde verwerking Douane en Accijnzen Roger Beeckman,projectleider Paperless."

Verwante presentaties


Ads door Google